Quick answer
Clear the upper-left orange and cyan curves and the exposed upper bars. Reduce the long left green frame before working through the lower central links.
- Level
- Level 311
- Difficulty
- Normal
- Objective
- Separate all linked pieces in this layout: Tall sleeve-linked web around two orange acorn loops. Align each opening with its connection, then clear the remaining branches.
Video walkthrough

Video by CHAMBER GAMING on YouTubeWatch on YouTube
YouTube loads only when you press play. You can also open the video on YouTube.
Step-by-step
Clear the upper-left orange and cyan curves and the exposed upper bars. Find the actual gap on this piece before turning it. Follow its contact with the neighboring link, rather than assuming the colored outlines form one object. Make a small controlled rotation and check whether the connection has released before selecting another part.
Reduce the long left green frame before working through the lower central links. Reassess the structure after each release: a piece that looked trapped at the start may now have only one neighbor. Use the empty area to see the next contact clearly. Follow the branch described here instead of jumping to a similar color elsewhere.
Finish the blue and green lower chain and the remaining orange curved pair. Watch the final connection as well as the open ends. A nearly empty board can still contain a linked pair, so keep aligning the gap with the remaining contact. Stop repeating a turn that changes nothing and inspect which neighboring piece still holds the chain.
Tips
- Clear the upper-left orange and cyan curves and the exposed upper bars.
- Reduce the long left green frame before working through the lower central links.
- Finish the blue and green lower chain and the remaining orange curved pair.
- After every release, check which pieces are still connected; color alone does not determine the move order.
Common mistakes
- The long green frame can remain attached near its lower end after its upper branch clears.
- Repeating the same rotation without checking the opening and the remaining contact.
Frequently asked questions
How do I start Rotate Rings level 311: Tall sleeve-linked web around two orange acorn loops?
Clear the upper-left orange and cyan curves and the exposed upper bars. Match this branch by its position and shape before moving. If your starting arrangement differs, compare the video with your board rather than forcing the same sequence.
What is the key transition in level 311?
Reduce the long left green frame before working through the lower central links. Keep watching the contact points as the structure shrinks. The next release depends on what remains linked, so recheck the gap after a neighboring piece disappears.
What can block the finish in this layout?
The long green frame can remain attached near its lower end after its upper branch clears. For the finish: Finish the blue and green lower chain and the remaining orange curved pair. Move one remaining piece at a time and wait for its release before deciding whether another contact still needs attention.