Quick answer
Open the upper-left cyan and lower-right orange corner links. Release the central green upright and the slanted blue connection near the bottom.
- Level
- Level 122
- Difficulty
- Normal
- Objective
- Separate all linked pieces in this layout: Slanted top bars over two acorn ring columns. Align each opening with its connection, then clear the remaining branches.
Video walkthrough

Video by GAMISTAN ARENA on YouTubeWatch on YouTube
YouTube loads only when you press play. You can also open the video on YouTube.
Step-by-step
Open the upper-left cyan and lower-right orange corner links. Find the actual gap on this piece before turning it. Follow its contact with the neighboring link, rather than assuming the colored outlines form one object. Make a small controlled rotation and check whether the connection has released before selecting another part.
Release the central green upright and the slanted blue connection near the bottom. Reassess the structure after each release: a piece that looked trapped at the start may now have only one neighbor. Use the empty area to see the next contact clearly. Follow the branch described here instead of jumping to a similar color elsewhere.
Finish the two side acorn circles and the remaining red-green lower pair. Watch the final connection as well as the open ends. A nearly empty board can still contain a linked pair, so keep aligning the gap with the remaining contact. Stop repeating a turn that changes nothing and inspect which neighboring piece still holds the chain.
Tips
- Open the upper-left cyan and lower-right orange corner links.
- Release the central green upright and the slanted blue connection near the bottom.
- Finish the two side acorn circles and the remaining red-green lower pair.
- After every release, check which pieces are still connected; color alone does not determine the move order.
Common mistakes
- The slanted lower bar joins both columns and must be traced to its far end.
- Repeating the same rotation without checking the opening and the remaining contact.
Frequently asked questions
How do I start Rotate Rings level 122: Slanted top bars over two acorn ring columns?
Open the upper-left cyan and lower-right orange corner links. Match this branch by its position and shape before moving. If your starting arrangement differs, compare the video with your board rather than forcing the same sequence.
What is the key transition in level 122?
Release the central green upright and the slanted blue connection near the bottom. Keep watching the contact points as the structure shrinks. The next release depends on what remains linked, so recheck the gap after a neighboring piece disappears.
What can block the finish in this layout?
The slanted lower bar joins both columns and must be traced to its far end. For the finish: Finish the two side acorn circles and the remaining red-green lower pair. Move one remaining piece at a time and wait for its release before deciding whether another contact still needs attention.